1. <span id="z91vf"><pre id="z91vf"><sup id="z91vf"></sup></pre></span>

    <rp id="z91vf"><ruby id="z91vf"><input id="z91vf"></input></ruby></rp>
    Welcome to Huizhou Zhengwei Coating Co.,Ltd.!
    Home|Ebook|Backstage|Email

    Products ---- PE Primer series

    PE Primer series

    Product name Code Supported
    Thinner
    Construction
    ratio
    Hardness of
    paint film
    Performance Scope of
    application
    PE transparent Putty 2706-1 V204 100:1.5:1.7 H/2H good filling capacity, Good polish performance Solid wood MDF
    PE transparent Primer 2816 V204 100:1.5:1.7:30-40 H/2H Leveling property, transparency, hardness sticker/ Veneer
    PE ultra-clear Primer 2812 V204 100:1.5:1.7:30-40 H/2H Leveling property, transparency, hardness sticker/ Veneer
    PE white Primer 2718-W V204 100:1.5:1.7:30-40 H/2H Leveling property, transparency, hardness MDF
    PE white Primer 2716-W V204 100:1.5:1.7:30-40 H/2H Leveling property, transparency, hardness MDF
    PE black Primer 2716-B V204 100:1.5:1.7:30-40 H/2H Leveling property, transparency, hardness MDF

    Note: Construction ratio (Reference) (25ºC, humidity 75%)

    Paint: blue water: Whitewater: Thinner=100:1.2:1.4:30-50(wt), when the humidity decreases the blue water and white water discretion to reduce, humidity increases, the blue water and white water may be increased.

    Technical indexes:

    Item Index(enterprise standard)
    Appearance of paint thick liquid
    Appearance of paint film transparent, flat
    Solid (%) ≥43
    Drying time(25ºC, humidity 75%) Surface drying≤60min; actual drying ≤24h
    Activation period (min) 20±5

    Construction method:

    1. Preparation method (Reference)(25ºC-30ºC)

    Component A: 100 portions paint with 30-40 Thinner, stir joined Blue Water 1.8 portions and immediately stir, filter back.

    Component B: 100 portions paint with 30-40 Thinner, stir join Whitewater 2.2 portions and immediately stir, filter back (Note: Component B construction effectiveness of 2h).

    2. The Component A with Component B 1: 1 after the mixture evenly, immediately spraying, when atomized spray paint deterioration occurred during the time, can not be reused, to be re-equipped with paint.

    3. The coating amount can not exceed 220g / m2, each time re-coating, the intermediate process must be polished, and the polished recoating intervals not exceeding 6h.

    4. The grinding time under normal conditions, the film should be after 5h (No. 240 sandpaper).

    Packing and storage:

    20KG metal pail. Stored in a cool, dry and well-ventilated place. Shelf life is two months from date of manufacture. if expired, qualified products after tested is still usable.

    [ Close ]

    Huizhou Zhengwei Coating Co.,Ltd.

    Add: Yongping Development Park, Tonghu Town, Huizhou, China

    Tel: 0086-752-3891901 / 3891902      Fax: 0086-752-3891828

    E-mail: hzzwtl@163.com                      Url: www.samanthijayasuriyabcba.com

    • Micro station
    • Mobile version
    Copyright(C)2015, Huizhou Zhengwei Coating Co.,Ltd. All Rights Reserved. Supported by ChemNet ChinaChemNet Toocle Copyright Notice
     
     
     
     
     
    性欧美大战久久久久久久免费观看_欧美成a高清在线观看_久久精品麻豆日日躁夜夜躁_国内精品久久久久久久影视麻豆
    1. <span id="z91vf"><pre id="z91vf"><sup id="z91vf"></sup></pre></span>

      <rp id="z91vf"><ruby id="z91vf"><input id="z91vf"></input></ruby></rp>